Efficiency Comparison
Permalok庐 Excels in Trenchless Technology Applications
Selecting Permalok庐 casing pipe over field-welded pipe provides an advantage you can take to the bank. Our proprietary airtight joints seal within minutes, compared to hours reserved for joint welding. The below examples demonstrate real savings in time and money in trenchless installations.
24鈥 Steel Pipe Installation Comparison
Permalok Casing
Using the Permalok T-5 Joint, an install crew can make a watertight connection in 6 minutes. With each connection adding only minutes to the install time, a crew may install up to 10 pieces of 20鈥 casing pipe in an eight-hour shift.
End Results: 200 linear feet per day.
Welded Steel Casing
A skilled field welder takes an average 90 minutes to fit and butt weld one joint on 24鈥 x .500鈥 casing. The same size crew will only be able to install three to four 20鈥 long pipe in an eight-hour shift.
End Result: 60 to 80 linear feet per day.
60鈥 Steel Pipe Installation Comparison
Permalok Casing
Unlike welding, the size of the pipe does not affect joint time. Again, the Permalok T-5 Joint is complete in 6 minutes. The install crew may install up to 10 pieces of 20鈥 casing pipe in an eight-hour shift.
End Results: 200 linear feet per day.
Welded Steel Casing
A skilled field welder takes on average 180 minutes to fit and butt weld one joint on 60鈥 x .750鈥 casing. The same size crew will only be able to install two to three pieces of 20鈥 long pipe in an eight-hour shift.
End Result: 40 to 60 linear feet per day.