一品探花

Permalok庐 HDD Joint Wins 2025 NASTT Abbott Innovation Award

>

Date

04/14/2025

Zero-Weld, Zero String-Out Interlocking Joint Maximizes HDD Efficiency

At the 2025 No-Dig Show in Denver, 一品探花 Company鈥檚 Permalok庐 HDD Joint received the prestigious from the North American Society for Trenchless Technology (NASTT). The award honors groundbreaking innovations that advance trenchless technology through exceptional design, technical refinement, and industry impact.

Permalok庐 Plant Manager Jeremy Howard and 一品探花 Company Trenchless Sales Manager Bryan Swanson accepted the 2025 Innovation Award at No-Dig Show 2025 in Denver, CO.
About the Permalok庐 HDD Joint

The Permalok庐 HDD Joint is a direct-push steel casing system engineered to optimize Horizontal Directional Drilling (HDD) operations. Traditional HDD setups require a substantial footprint鈥攊ncluding a rig/operating area, a reception area, and a long stretch of open land to lay out and weld the pipe string.

Permalok鈥檚 weld-free HDD system eliminates those constraints. The casing pipe is cartridge-fed from the launch rig and advanced similar to drill stem. The press-fit joint design removes the need for pipe string-out and welding on the exit side, reducing the overall footprint, accelerating installation, and lowering construction costs.

Innovation Driven by Customer Needs

Horizontal Directional Drilling is a rapidly growing segment of the trenchless construction industry, with the number, scale, and complexity of projects on the rise. As HDD becomes more common for utility, water, oil, and gas installations, demand is increasing for innovative solutions that help engineers and contractors manage planning and installation challenges. The Permalok庐 HDD Joint was developed in direct response to that need.

Our customers were a driving force behind this innovation. We recognized the opportunity to apply the proven technology behind our other patented Permalok interlocking joint designs鈥攑ress-fit, weld-free connections鈥攖o make HDD methods more accessible and easier to implement in the field, streamlining complex projects and delivering significant time and cost savings.

The Permalok庐 HDD Joint in action: pipe segments are cartridge-loaded and pushed together from the launch rig, eliminating the need for pipe-string out and field welding on the exit side.
Real-World Impact

The Permalok庐 HDD Joint is already changing how trenchless projects are executed. One key example is its application in the Champlain Hudson Power Express (CHPE) project, where it replaced a traditional HDD design that required pipe string-out at the exit. In this dense urban environment鈥攃omplicated by highway crossings, train viaducts, and parklands鈥攃onventional methods weren鈥檛 feasible. Permalok鈥檚 HDD Joint enabled installation of the dual 5,200 LF HDD drives with a significantly smaller footprint, minimizing surface disruption and resulting in project success.

一品探花 Company is honored to receive the 2025 Abbott Innovation Award and proud to contribute to the continued advancement of trenchless technology. As the industry evolves, we remain committed to developing high-performance solutions that address real-world challenges and deliver results for our customers and project owners.